Project Overview
As part of the tenant finish for Tellus Outdoor, the project required the construction of a new bathroom and mechanical room. This involved installing a modern plumbing system to support the functionality and compliance of the new facilities within the existing space.
Scope of Work
- Bathroom Installation:
- Designed and installed plumbing for a new restroom, including water supply and drainage lines.
- Sourced and installed high-efficiency fixtures such as toilets, sinks, and faucets to reduce water consumption and meet local environmental standards.
- Mechanical Room Setup:
- Created a plumbing layout for the mechanical room to house essential systems, including water supply lines, drainage connections, and space for future maintenance access.
- Installed water heaters and necessary valves for regulating water flow and temperature.
- System Modernization:
- Upgraded existing infrastructure to accommodate the new facilities, ensuring compliance with local plumbing codes.
- Integrated durable materials and efficient designs to support long-term reliability and performance.
Challenges and Solutions
- Challenge: Retrofitting new plumbing into an existing space with minimal disruption to the construction schedule.
Solution: Coordinated closely with other trades and utilized phased installation techniques to streamline the process and meet project timelines. - Challenge: Ensuring compliance with updated plumbing codes in an older building.
Solution: Conducted detailed inspections and collaborated with local authorities to ensure all installations met or exceeded requirements.
Results
The addition of the new bathroom and mechanical room provided Tellus Outdoor with essential, functional facilities that aligned with their operational needs. The plumbing system was designed for efficiency and durability, contributing to the overall success of the tenant improvement project.