Project Overview
This project involves the plumbing installation for a new Chick-fil-A location in Lafayette, CO. The scope focuses on providing robust and efficient plumbing systems to support the restaurant’s high-volume operations, ensuring compliance with industry standards and local codes.
Scope of Work
- Plumbing System Design and Installation:
- Developed a plumbing layout tailored to the needs of a quick-service restaurant, including water supply and drainage systems to support kitchen operations, restrooms, and utility areas.
- Installed main water and sewer connections to accommodate high-capacity usage.
- Kitchen Plumbing:
- Installed water lines and drainage systems for commercial-grade kitchen equipment, including sinks, dishwashers, fryers, and beverage stations.
- Provided connections for grease traps and interceptors to ensure compliance with local health and safety regulations.
- Restroom Build-Out:
- Constructed restrooms with durable, water-efficient fixtures such as toilets, sinks, and faucets to handle heavy customer traffic.
- Ensured all restroom facilities complied with ADA accessibility standards.
- Mechanical Room Setup:
- Built a mechanical room to house water heaters, pressure regulators, and plumbing controls, ensuring easy maintenance and long-term reliability.
- Utility Area Plumbing:
- Installed plumbing for janitorial sinks and utility stations to support cleaning and maintenance needs.
- Designed drainage systems to manage wastewater effectively and prevent backups during peak operations.
Challenges and Solutions
- Challenge: Adhering to a tight construction schedule while ensuring high-quality plumbing installations.
Solution: Coordinated closely with the general contractor and other trades to streamline work and meet project deadlines without compromising quality. - Challenge: Addressing the specific needs of a high-capacity quick-service restaurant.
Solution: Used industry-leading fixtures and materials to handle high demand, ensuring reliability and minimal maintenance for future operations.
Anticipated Results
Upon completion, the new Chick-fil-A location will feature a reliable and efficient plumbing system designed to support the restaurant’s daily operations seamlessly. The system will meet the demands of high-volume kitchen activity and customer use, ensuring sustainability, compliance, and functionality.