Project Overview
The Picklr project involves the plumbing installation for a state-of-the-art indoor pickleball court facility in Thornton, CO. The project’s scope includes designing and installing plumbing systems to support restrooms, locker rooms, and other essential amenities, ensuring functionality and compliance for a high-traffic recreational environment.
Scope of Work
- Plumbing System Design and Installation:
- Developed a comprehensive plumbing plan to accommodate the facility's operational needs, including water supply and drainage systems.
- Installed main water lines and sewer connections to support multiple restrooms, locker rooms, and utility areas.
- Restroom and Locker Room Build-Out:
- Installed commercial-grade fixtures in restrooms and locker rooms, including toilets, sinks, and showers, designed for durability and high usage.
- Implemented water-saving features to align with sustainability goals and reduce operational costs.
- Mechanical Room Construction:
- Built and equipped a mechanical room to house water heaters, valves, and other plumbing controls.
- Designed the system for accessibility and future scalability to accommodate potential facility expansions.
- Utility Area Plumbing:
- Installed connections for utility sinks and janitorial stations to support cleaning and maintenance operations.
- Enhanced drainage systems to ensure efficient wastewater management.
Challenges and Solutions
- Challenge: Meeting the high plumbing demands of a recreational facility under a tight construction schedule.
Solution: Coordinated closely with the construction team to ensure all plumbing milestones aligned with the overall project timeline. - Challenge: Ensuring durability and reliability in a high-traffic environment.
Solution: Selected robust, low-maintenance materials and fixtures to withstand heavy use and minimize long-term maintenance costs.
Anticipated Results
Once completed, the Picklr indoor pickleball court facility will feature efficient, high-quality plumbing systems that meet the needs of both recreational players and staff. The facility’s plumbing infrastructure is designed for reliability, sustainability, and ease of maintenance, contributing to the overall success of the project.