Boyd Lake Commerce Center (BLCC)

Location: Loveland, CO

Project Type: Commercial Tenant Improvement

Project Overview

This project involved the tenant finish of an existing warehouse building for BLCC, transforming the space to meet the specific operational requirements of the tenant. The scope included comprehensive plumbing installations to support the new layout, ensuring functionality, compliance, and efficiency.

Scope of Work

  • Plumbing System Installation:
    • Designed and installed plumbing systems to accommodate the warehouse's specific needs, including water supply and drainage.
    • Implemented infrastructure for restrooms, utility sinks, and other facility requirements.
  • Fixture Installation:
    • Installed commercial-grade fixtures, including sinks, toilets, and faucets, to handle the demands of a warehouse environment.
    • Ensured all fixtures met durability and efficiency standards for long-term performance.
  • Mechanical Room Setup:
    • Built out a mechanical room to house essential plumbing systems, including water heaters, supply valves, and drainage connections.
    • Designed for accessibility and ease of maintenance, ensuring long-term reliability.
  • Code Compliance and Testing:
    • Ensured all plumbing systems were compliant with local codes and regulations.
    • Conducted pressure and flow rate tests to validate the system's performance and reliability.

Challenges and Solutions

  • Challenge: Adapting the plumbing infrastructure of an existing warehouse to meet the new tenant’s specific needs.
    Solution: Conducted a detailed site evaluation and coordinated closely with contractors to design and implement a plumbing system tailored to the building’s layout and operations.
  • Challenge: Meeting a tight project timeline while ensuring quality.
    Solution: Utilized efficient installation methods and worked in tandem with other trades to maintain project schedules without compromising standards.

Results

The completed tenant finish provided BLCC with a functional and efficient warehouse space tailored to their needs. The plumbing systems were designed for reliability and ease of maintenance, supporting the tenant's operations while meeting all regulatory requirements.